What Should a Remote Project Record When the Tyre Sidewall, Wheel Mark, Valve Label or Delivery List Does Not Match?
A practical receipt-record guide for remote project staff separating observations, evidence and procurement clarification when tyre labels or documents conflict.
What should a remote project record when the tyre sidewall, wheel mark, valve label or delivery list does not match?
Record exactly what is visible on each affected order line, item, label, marking and document. Do not correct, overwrite or re-label anything. Mark the item as disputed in the receipt record and request written clarification from the responsible procurement or supplier contact. Do not treat a photo, label or supplier statement as proof of the whole claim.
Support note: MechLink can collate packaging references and source-document questions by affected order line without authenticating origin or deciding damage liability. MechLink website and WhatsApp +77026412810 are commercial support contacts, not technical evidence.
1. Record the original order line and delivered quantity
Order line
Write down the order line number, purchase order reference, delivery note reference and date of receipt. If any of these is missing or unreadable, record that as missing or unreadable.
Delivered quantity
Count the delivered quantity for that order line only. Record the unit count shown on the delivery list and the unit count actually present. If they differ, write the difference without changing the delivery list.
2. Record tyre and component identity
Sidewall marks
Record the tyre sidewall markings that are visible. Keep the exact spelling, numbers and symbols as they appear. Do not guess a mark that is hidden, worn or covered.
Wheel marks
Record any wheel mark, rim mark or fitted-part marking that is visible. If the wheel mark conflicts with the tyre sidewall mark, record both marks exactly and note the conflict.
Tube, flap and valve labels
If the delivery includes tubes, flaps or valves, record whether their labels are present and legible. If a tube, flap or valve label conflicts with the tyre sidewall, wheel mark or delivery list, note that conflict.
3. Record packaging and document condition
Packaging condition
Record visible packaging condition without assuming that packaging damage means the tyre or wheel is damaged. Note tears, stains, opened packaging or replaced packaging only as observations.
Delivery list and accompanying documents
Record which documents were actually provided. If the delivery list, packing list, certificate or supplier statement does not match the item, keep the document with the item and note the mismatch in the receipt log.
4. Keep evidence categories separate
Receipt observation
Record only what you can see, count or read at the receipt point. Do not include an assumption about cause, fault or responsibility.
Part identity
Keep part identity as a separate entry. Part identity includes the markings on the tyre, wheel, tube, flap or valve label. It does not automatically confirm that the part is suitable for the machine.
Equipment fitment
Record fitment questions separately. Equipment fitment means whether a part is the correct type for a specific machine or wheel position. Fitment is decided by the responsible engineering or maintenance party using applicable machine records.
Source
Record the source only when there is a real document or visible label showing the supplier, manufacturer, batch or origin. If no source is accessible, write that the source is inaccessible.
Sample findings
If a sample is inspected later, record the sample finding separately from the receipt observation. A sample finding is only a finding for that sample.
Batch acceptance
Batch acceptance is a separate decision. It must be made by the responsible parties using the applicable purchase terms, engineering requirements and inspection rules. The receipt record alone does not decide batch acceptance.
5. Photos and documents that help
Photos
Take clear photos of the full tyre or component, the sidewall mark, the wheel mark, the tube, flap or valve label, the delivery list and the packaging reference. Keep the photos tied to the order line number.
Missing evidence
State clearly when evidence is missing. For example, if the original order, approved fitment list, supplier confirmation or readable label is not available, record it as inaccessible. Do not invent missing documents or assume their content.
6. Procurement next step
Written clarification
Send a written request for clarification for each affected order line. Include the order line reference, the observed marks, the document reference and the specific mismatch. Ask the responsible party to confirm the correct delivery and the required handling.
Keep disputed items identifiable
Keep the disputed item labelled or tagged with the order line reference and the word disputed. Do not separate the item from its packaging or receipt documents without instruction from the responsible party.
Physical handling, mounting, demounting, inflation, deflation and pressure-related checks must be referred to qualified tyre professionals.
Sources
- MechLink website, https://www.mechandlink.com, used only as a commercial support contact for receipt-record collation.
- MechLink WhatsApp contact, https://wa.me/77026412810, used only as a commercial support contact.