Receipt Records and Discrepancies for Tyre Parts at a Remote Project
What to record when the sidewall, wheel mark, valve label or delivery list does not match, and how to keep observations separate from assumptions and acceptance.
What should a remote project record when the tyre sidewall, wheel mark, valve label or delivery list does not match?
Record the observed mismatch without deciding the cause. Capture the order line, delivered quantity, tyre or component identity, sidewall and wheel marks, valve and tube or flap labels, packaging condition, photos, received documents and the exact difference seen. Keep each disputed item identifiable and request written clarification before any acceptance decision. Do not install, inflate, deflate, mount, demount or pressure-test a suspect item. Do not discard packaging or change markings.
1. Record the observation first
Record what is seen
Write down the visible difference, not the meaning. For example, record 'sidewall marking on the delivered tyre reads X and the delivery list shows Y', not 'somebody sent the wrong tyre'.
Keep the item identifiable
Tag or separate the disputed item if it is safe to do so. Use a tag or the delivery reference to keep it traceable. Do not alter, clean or remove the marking unless a qualified person confirms it is safe.
Record time and place
Note the date, time, project location and who made the observation. If connectivity is limited, keep a written or photo log and send it later.
2. Record order line and delivered quantity
Order line
Copy the order or contract reference, line number, description and requested tyre or component description from the document actually available at the site. If the order document is not available, record that it was not available.
Delivered quantity
Count the items physically present and compare that with the delivery list. If packaging has not been opened, record that the quantity was not physically verified. Do not guess missing or extra units from the list alone.
Quantity discrepancy
Record the observed count and the list count separately. Use neutral words such as 'counted two units, delivery list shows three'. Do not state who caused the difference.
3. Record tyre and component identity
Tyre identity
Record all visible tyre markings: brand, size, pattern or product code, serial or DOT-type manufacturer code if legible. If a marking is not legible in the current light or packaging, write that it was not legible.
Wheel identity if visible
Record visible wheel marks only. Do not dismantle a rim or separate a tyre from a wheel to inspect hidden marks. If the wheel mark is not visible without dismantling, record 'not visible without dismantling; not inspected'.
Tube, flap and valve labels
If tubes, flaps, valves or valve labels are delivered separately, record the label details. If a label is missing or does not match, record exactly that observation. Do not guess compatibility between valve and tube parts.
4. Record sidewall and wheel marks
Sidewall mark detail
Record sidewall information exactly as printed, such as size, load or speed description, brand, pattern name and production week/year if visible. Do not interpret codes unless the actual key is available on the delivered document.
Wheel mark detail
Record wheel stamping or label characters only when visible from the outside. If the marking is hard to read, take a close-up photo and note that the photo is an observation, not proof of origin.
Mark comparison
Compare each recorded mark with the delivery list or order line. Record one of three outcomes: matches, does not match, or cannot be confirmed because a source document was unavailable.
5. Record valve, tube and flap labels
Label condition
Record whether valve, tube or flap labels are present, damaged, partially missing or unreadable. Keep the label with the item and do not remove it.
Label wording
Write the wording or codes on each label. If the label conflicts with the delivery list, record the wording on both and state that a discrepancy was observed.
Unconfirmed claims
A label is not proof of origin, pressure rating or compatibility. Treat it as one record among others. Do not state that a label confirms safety or suitability.
6. Record packaging condition and documents
Packaging condition
Record whether packaging is intact, opened, wet, torn or marked. Do not discard packaging until the responsible party confirms it is no longer needed for the discrepancy record.
Document set actually received
List documents actually present: delivery note, packing list, invoice, certificate, test report or supplier note. If a document is not present, record 'not provided' or 'not available at receipt'. Do not say it exists elsewhere unless that source is confirmed.
Document comparison
If documents conflict with the sidewall, wheel mark, valve label or quantity, record the exact wording from each document. Keep documents or copies with the observation record.
7. Separate observations, assumptions and acceptance
Observation list
Keep observations in one list: what was seen, counted, photographed or read from a label.
Assumptions list
Keep assumptions or questions in a separate list. For example, 'the delivered item looks different from the order' is an assumption if origin has not been verified. Mark it as unverified.
Fitment and source separation
Keep receipt observation, part identity, equipment fitment, source, sample findings and batch acceptance separate. Do not mix a visual observation with a fitment conclusion.
Sample findings and batch acceptance
If only a sample was visually checked, record it as a sample observation. Do not apply the finding to the whole batch unless the responsible party decides that under the applicable requirements.
8. Request written clarification and next procurement step
Written request
Send the observation list to the procurement or logistics contact and ask for written clarification. Keep the request and response with the receipt record.
Stop technical handling
Do not install, inflate, deflate, mount, demount or pressure-test a suspect tyre or wheel. Refer physical handling to qualified tyre professionals. Do not decide legal rejection or final acceptance; only the responsible party decides using the applicable contract, purchase terms and technical requirements.
Keep evidence available
Keep the disputed item identifiable and available for inspection. Preserve the packaging, labels and documents until the responsible party gives a written instruction.
9. Sources
No external sources were used. No standards, supplier statements, reports, pages, numbers, dates, legal conclusions, specifications, or test results are cited because none were available to this guide.