Kazakhstan Engineering Tyre Parts Information GuideKazakhstan Engineering Tyre Parts Information Guide独立轮胎、轮辋与相关配件资料指南 / Independent tyre, wheel and related parts evidence guidance
Receipt Records and Discrepancies

Recording Tyre Sidewall, Wheel Mark, Valve Label or Delivery List Mismatches on a Remote Project

A practical record-keeping guide for remote project staff separating observation from assumption and requesting written clarification without assigning blame.

Recording Tyre Sidewall, Wheel Mark, Valve Label or Delivery List Mismatches on a Remote Project

When a tyre sidewall, wheel mark, valve label or delivery list does not match, record the order line, delivered quantity, tyre or component identity, sidewall and wheel marks, packaging condition, tube/flap/valve labels, photos, documents and the observed discrepancy.

Separate observations from assumptions. Keep disputed items identifiable and request written clarification from the supplier or responsible party. Do not mount, demount, inflate, deflate or pressure-test a suspect tyre. Do not discard packaging or dismantle a rim. Do not state that the parts are rejected unless the responsible party confirms that under the applicable requirements. This guide covers record-keeping only; it is not a safety release or acceptance platform.

1. Start with the order line and delivery document

An order line is one row on a purchase order or delivery note that usually lists an item description, reference and quantity. Start the record there because it shows what was ordered or expected.

Record what the delivery document says

  • Document number or date, if shown.
  • Supplier or transport party named on the document.
  • Order line or item reference.
  • Description stated on the document.
  • Quantity stated on the document.
  • Any batch, serial or label reference stated on the document.

Record what was physically received

  • Count of tyres or tyre parts visible without unpacking more than necessary.
  • Count of packages, bundles or pallets received.
  • Whether the quantity is based on a full count or only a visible count.
  • If an item is not fully inspected, record that it is not fully inspected.

Keep delivered quantity separate from accepted quantity

Delivered quantity means what arrived. Accepted quantity is a later decision for the responsible party. Record the delivered quantity as an observation, not as acceptance.

2. Record tyre and component identity exactly

Tyre sidewall marking

The sidewall is the outer side of the tyre. Record exactly what is legible: brand, size, pattern or model, and any manufacturer, approval, date or serial mark only if present and legible. If a mark is not legible, write that it is not legible. Do not guess missing characters.

Wheel mark

If the wheel or rim mark is visible without dismantling, record what it says. If it is not visible, record that it was not inspected. Do not remove or dismantle the rim to find a marking.

Tube, flap and valve labels

Record label text, code, colour or position if visible. If a label is missing, record it as missing. If a valve label or tube/flap label differs from the delivery document, record both what the document says and what is physically seen.

3. Record packaging condition and preserve evidence

What to photograph

Photograph the overall delivery, package labels, close-ups of sidewall marks, wheel marks and valve labels, and any visible damage or loose items. If possible, include a time and date reference in the record, but do not add a date if the camera or site system does not provide one.

Do not discard packaging

Packaging may carry labels, batch information, tube/flap labels or valve identifiers that are needed later. Keep packaging until the responsible party instructs otherwise in writing.

Do not alter or test the suspect item

Leave the item as received. Mark or tag it for identification only if site procedure allows and the marking does not damage evidence.

4. Separate observations from assumptions

Observation example

A sidewall marking may read one size while the delivery note line states another. Record that as two different pieces of information.

Assumption example

Do not write that the tyre is the wrong part or that the supplier made an error unless the responsible party confirms it. Write only the observed difference and the document reference.

Keep disputed items identifiable

Label or tag the item with a unique reference if site procedure allows. Keep it separate from accepted stock so it is not used before clarification.

5. Record documents and photos as evidence only

What documents to retain

Keep the delivery note, packing list, transport document, customs document or any supplier note only if actually provided. If a document was not provided, record that it was not provided.

Why a receipt photo, label or supplier statement is not proof of every claim

A photo shows what was visible at the time. A label shows what was marked. A supplier statement records that party's position. They do not by themselves prove fitment, acceptance, cause or contract compliance. Only responsible parties decide acceptance using the applicable requirements.

6. Missing evidence and inaccessible sources

State what was not inspected

If a marking, label or document page was not accessible, record that it was not inspected. Do not reconstruct missing information.

Avoid inventing standards, reports or dates

Do not cite a standard, report, page number, date, legal conclusion, specification or test result unless an actual applicable document or record is available and has been read. If not available, write unknown or not available.

Keep record categories separate

Keep receipt observation, part identity, equipment fitment, source, sample findings and batch acceptance as separate parts of the record. A receipt observation does not decide equipment fitment. A supplier label does not decide batch acceptance by itself.

7. Procurement next step

Request written clarification

Send a neutral written request to the supplier or responsible project contact. Include the order line or delivery reference, a list of the observed differences, and a request for written clarification. Do not assign blame.

What to ask

  • Which delivered item corresponds to which order line?
  • Was a substitution or packing error possible?
  • What written document can the supplier provide for the correct identity or batch?
  • What does the responsible party require before the item is accepted or quarantined further?

Who decides acceptance

Only the responsible project, procurement or contract party decides acceptance using the applicable contract, specification and site requirements. The receiving record supports that decision; it does not replace it.

Refer physical handling

If a suspect tyre or wheel needs to be inspected, balanced, fitted or removed, refer it to a qualified tyre professional. Do not give or follow mounting, demounting, inflation, deflation or pressure-testing instructions in the receipt record.

Sources

No external sources were used in preparing this guide. It is based on general record-keeping practice and the editorial requirements supplied. No manufacturer documentation, standard, test report, law or inspection record is cited.